KEY PERSONNEL
Electrical-EngineersIntroduction
Electrical-EngineersProject Approach
Electrical-EngineersKey Personnel
Electrical-EngineersTelephone: 570.825.7760

Select A Department:
Principals | Mechanical | Electrical | Energy | Technology | Administration

» Electrical

Stan Mikulski Stacey
Electrical Designer
Stan Mikulski

Stan graduated from the Pennsylvania State University with a Bachelor of Science in Electrical Engineering. He has been practicing electrical design since 2007 and has experience in lighting layouts and calculations, building electrical distribution system, fire alarm system, telecommunications and security design/layout as well as specifications. Throughout the years Stan has done most of his work in PA, NY and NJ and has gained knowledge of K-12, Higher Education, Government, Commercial and Medical markets. Along with electrical design, Stan also manages projects and is in charge of construction administration.


Stacey Berkoski Stacey
Electrical Designer
Stacey

Stacey is a member of Arris’ Electrical Engineering Department. Stacey has a Bachelor of Science Degree from Wilkes University and has been practicing engineering since 2006. She has worked primarily on Arc Flash Analysis for commercial, institutional, and industrial projects. Stacey is responsible for design and CAD drawings, preparation of specifications, and implementation of studies.


Barb Tibus Stacey
Electrical Designer
Barb Tibus


Shelly Shubilla Shelly Shubilla
Electrical Designer
Shelly Shubilla


James Redington James Redington
Electrical Designer
James Redington


Amy Baird Amy Baird
Electrical Designer
Amy Baird


NEWS

Arris Engineering has recently been awarded another design project at the Tobyhanna Army Depot. The renovations and additions to the Building 72 Mezzanine area marks the fifth project awarded this year. Arris will act as the lead design professional for this project and will work with M.E.R.I.T. Inc. in a design/build capacity to complete construction of the renovation and addition.


Arris has implemented Autodesk Revit MEP. The new software has allowed Arris to work with Architects that also utilize the Architectural version of the software and better serve to meet the client’s needs when considering a complete building system package. The software conversion included all the aspects of Autocad MEP and also allows for designs to be completed with the use of 3-D building components.

HIGHLIGHTED PROJECTS
ALBERT EINSTEIN MEDICAL CENTERElectrical Engineers ALBERT EINSTEIN MEDICAL CENTER The Albert Einstein Medical Center is a teaching hospital offering a full range of advanced health services to the Philadelphia community and beyond. More>>
ALBERT EINSTEIN MEDICAL CENTERElectrical Engineers HATBORO
SEWER AUTHORITY TREATMENT PLANT The System upgrade at the treatment facility. More>>

WEST CHESTER UNIVERSITYElectrical Engineers MISSION FOODS The design for all HVAC, plumbing, fire protection, and electrical systems for a new 139,000 square foot Manufacturing and Administrative Facility. More>>
WEST CHESTER UNIVERSITYElectrical Engineers WEST CHESTER UNIVERSITY Upgrade of the existing medium voltage power system. More>>