|
|
 |
| Portfolio Overview - View
Detailed Portfolio |
| WEST CHESTER UNIVERSITY |
The project involved the replacement of the building’s 500KVA dry-type unit substation with a new 750KVA transformer and 2000A 120/208VY secondary switchgear. |
 |
| WEST CHESTER UNIVERSITY |
The project involves the upgrade of the remaining 5KV medium voltage power system on campus to 15KV operation. |
 |
| WHITE HAVEN - PA DEPT. OF GENERAL SERVICES |
Upgrade
of the Electrical Distribution System. |
 |
| HATBORO SEWER AUTH. TREATMENT PLANT |
System
upgrade at the treatment facility. |
 |
| WEST CHESTER UNIVERSITY |
Upgrade
of the existing medium voltage power system. |
 |
| POPE AND TALBOT |
Design
of a new customer owned 69 kv substation at the client’s manufacturing
site. |
|
 |
NEWS
Arris bidding major Fire Alarm project for the West Chester University in West Chester, Pa. The project includes the replacement of the entire head end system, inter-communication system and twenty seven building systems throughout the campus. In addition, thirty five existing building fire alarm systems will tied into and report all addressable information to the new head end system.
Arris Engineering Group
was recently awarded a professional design services contract to upgrade the electrical and plumbing systems for three major buildings located at the Hollidaysburg Veterans Home Complex near Altoona, Pa. More>>
|
ARC-Flash Analysis
Arris Engineering announces the introduction of ARC Flash Analysis to their list of services. More>>
|
|
 |
|
|