| WEST CHESTER UNIVERSITY |
The project involved the replacement of the building’s 500KVA dry-type unit substation with a new 750KVA transformer and 2000A 120/208VY secondary switchgear. |
 |
| WEST CHESTER UNIVERSITY |
The project involves the upgrade of the remaining 5KV medium voltage power system on campus to 15KV operation. |
 |
| WHITE HAVEN - PA DEPT. OF GENERAL SERVICES |
Upgrade
of the Electrical Distribution System. |
 |
| HATBORO SEWER AUTH. TREATMENT PLANT |
System
upgrade at the treatment facility. |
 |
| WEST CHESTER UNIVERSITY |
Upgrade
of the existing medium voltage power system. |
 |
| POPE AND TALBOT |
Design
of a new customer owned 69 kv substation at the client’s manufacturing
site. |