BUILDING SYSTEMS ENGINEERING PORTFOLIO - COMMERCIAL

Lackawanna Public Library System

PROJECT: Labor & Industry Office Building
LOCATION: Wilkes-Barre, PA
COMPLETION DATE: December, 2005
SERVICES: Building Systems Engineering

SYNOPSIS:

Construction was completed on a new 62,000 square foot three story facility. The facility houses the Department of Labor and Industry and the Pennsylvania Department of Lottery. The electrical scope of work included design of power, lighting, fire alarm, public address and security/access control design for each tenant. L&I’s lease agreement required emergency power backup for approximately 60% of their load so that they could remain functional during power outages. A 500 KW diesel generator was provided for this purpose as well as life safety needs.

In addition to building electrical systems, ARRIS designed the information technology and voice distribution throughout the facility. This included Cat 6E cabling for both systems which were taken from user locations and terminated on rack mounted patch panels located in closets on each floor.

 


Lackawanna Public Library System

PROJECT: Lackawanna Public Library System
LOCATION: Blakely, PA
COMPLETION DATE: 2003
SERVICES: Building Systems Engineering

OVERVIEW: The building systems group provided mechanical and electrical engineering design services for this new, state of the art municipal library.

SYNOPSIS:

New 12,000 sq ft library. The project involved the design mechanical and electrical systems for the new facility. The mechanical systems consisted of DX cooling utilizing a split system with air handling units and remote condensors, VAV terminal units with reheat and hydronic boiler.

Electrical systems consisted of interior and site lighting, power telecommunications and security.


Luzerne National Bank Building

PROJECT: Luzerne National Bank Building
LOCATION: Wilkes-Barre, PA
COMPLETION DATE: 2002
SERVICES: Building Systems Engineering

OVERVIEW: Upgrade and replacement of the existing steam plant and a majority of steam and condensate distribution piping

SYNOPSIS:

The existing building consisted of a 13 story steel frame structure housing mulit tennant professional office space that was originally constructed in the 1920’s. The exsiting steam heating system required replacement due to poor reliability. The exisitig boilers and condensate collection system had reached the end of it’s useful life.

The project required the installation of redundant boilers to provide backup. The fuel source was converted to natural gas. A New feedwater treatment system condensate collection system, steam distribution piping, condensate collection piping with new steam traps were provided.

Portfolio
Portfolio Overview
LACKAWANNA PUBLIC LIBRARY SYSTEM
LACKAWANNA PUBLIC LIBRARY SYSTEMThe building systems group provided mechanical and electrical engineering design services for this new, state of the art municipal library.
LUZERNE NATIONAL BANK BUILDING
LUZERNE NATIONAL BANK BUILDINGUpgrade and replacement of the existing steam plant and a majority of steam and condensate distribution piping.